5th December 2006
Twenty days before Christmas , the work in the Complex is still continuing , because probably next week the big snow will arrived here and we will open the winter season and we hope that the temperature are not going to be very low as was last year.
In wing A the work is concentrate now of making the columns for the next third floor.
In wing B the frame work for the roof slab is almost ready and in two days time the slab is gong to be make.
In wing C the tin -plates workers are on the roof .
Plating with gypsum cardboard is already on the second floor. Tiling the bathroom in this wing is almost ready as well .