25th May 2007
In this rainy days the work in the Complex is continuing mostly inside.
The thermo insulation of wing A has stopped this few days, but it will continuing , because the weather is changing from today , the rain stopped.
In the same wing all the corridors and the apartments are ready, plastered with gypsum plaster boards. The bathrooms on the last floor are not finished yet, the builders are tiling them at the moment. The bathrooms on the other floors are ready.
In wing B the reception is plastered and ready, on the ground floor, the first and second floor the corridors are plastering with gypsum plaster boards at the moment and in the apartments on the same floors the builders are plastering on the top of the gypsum plaster boards.
All the inner staircases in the maisonettes are have been fitted.
In wing C the doors of the ski lockers are fitted , the builders are finishing tiling the staircases on the ground floor and the staircases to the under ground floor where
ski lockers are situated .
In the same wing fitting of the railings of th staircases is continuing.